Sealants
Silicone and expansion joints — installed, inspected, repaired
Failed, missing or non-conforming sealant is a weatherproofing defect that blocks close-out. We install, inspect and repair silicone and expansion joints — small and large — to a standard that stands behind itself through the DLP.

What it is
The scope, done right
Failed, missing or non-conforming sealant is a weatherproofing defect that blocks close-out. M&M installs, inspects and repairs silicone and expansion joints — small and large — across glass, metal, stone and concrete substrates, and documents every joint so the superintendent can sign it off. One trade, held accountable through the defects liability period.
Caulking and silicone is the wet-seal trade that keeps water out of a building. On a facade, a joint is not decorative — it is the last line between the weather and the interior, and it is one of the first things a superintendent inspects at handover. M&M installs, inspects and repairs silicone and expansion joints across the full range of joint types a modern building carries: perimeter weather seals around windows, doors and curtain wall; movement and expansion joints between precast and facade panels; wet-area and internal joints; and the fine glazing seals around glass balustrades and frameless assemblies. We manage both small joints and large expansion joints to a standard built for durability, not just appearance at practical completion.
Failed, missing or non-conforming sealant is a weatherproofing defect, and weatherproofing defects sit on the critical path to close-out. A joint that has been run over a dusty substrate, tooled without a bond breaker, applied outside the sealant's temperature window, or sized wrong for the movement it has to absorb will craze, lose adhesion or split — and it will usually do so after the scaffold is down, when access is dear and the defects liability period is already running. A single non-conforming run can hold a whole elevation open. Getting the joint right the first time, and keeping a clear record that it was done properly, is what protects the programme and the retention.
The substrate is what makes sealant work difficult, and it is where an unqualified applicator gets caught out. A silicone that bonds happily to glass may need a primer to hold onto powdercoated or anodised aluminium, and a different approach again on mill-finish or stainless metals, concrete, precast, stone or timber. Neutral-cure chemistry is used where acetoxy cure would stain a porous stone or attack a coating. Joints have to be designed as well as filled: correct width-to-depth ratio, a backer rod or bond breaker so the sealant flexes on two faces instead of three, clean and dry adhesion surfaces, and tooling that drives the material into contact before it skins. External weather seals, internal movement joints and expansion joints are each detailed differently, and we treat each one on its own terms.
M&M runs project-specific trained tradespeople under quality-control managers to an approved methodology, the same model we use across every finishing trade. Before mass application we prove the joint — the right sealant for the substrate, the right joint design, and, where the joint is visible, an on-site colour match to the adjacent finish achieved before the bulk of the work goes in. Because we run day and night shifts and can bring on surge labour, a large re-seal or a live-facade repair can be sequenced around other trades and around the building's operating hours rather than stopping them.
Every joint we touch can be recorded. ITP documentation, live project records and time-stamped images of the work are captured and made available to the builder through OneDrive, viewable at any time. On a wet seal that matters twice over: it gives the superintendent the quality-assurance evidence needed to sign the joint off, and it gives the head contractor a complete record of what was installed, where and to what standard — a clean, traceable close-out through the defects liability period.
Because M&M carries the facade rectification, glass, stainless and painting trades under a single subcontract, caulking rarely travels alone. A balustrade defect list that mixes marked glass, scratched stainless and a failed weather seal can be closed by one crew, on one set of documentation, with one point of accountability — rather than three separate subcontractors and three records to reconcile while the elevation stays open. With teams across Australia and 25-plus years in the finishing trade, the joints are treated as part of finishing the building, not a separate call-out.
Where this scope has been proven hardest: the Western Sydney Airport and Sydney Metro silicone works.
What's included
Everything this scope covers
- Installation of new silicone weather seals to windows, doors and curtain wall
- Inspection and condition assessment of existing silicone and sealant joints
- Repair, cut-out and re-seal of failed or non-conforming joints
- Small joints and large expansion / movement joints
- Perimeter weather seals and internal wet-area joints
- Silicone joints around glass balustrades and frameless glazing
- Joint design correction — width-to-depth ratio, backer rod and bond breaker
- Substrate-appropriate sealant selection (glass, powdercoated and anodised aluminium, stainless, stone, concrete, precast, timber)
- Substrate preparation, priming where required, and correct tooling
- On-site colour match of visible joints before mass application
- Day and night shifts and surge labour for large or live-facade re-seals
- ITP documentation, live project records and time-stamped images via OneDrive
What this fixes
The handover risks this scope removes
Weatherproofing defects blocking close-out
A failed or missing perimeter seal is a water-ingress defect that holds an elevation open. Getting the joint conforming and documented is often what stands between the programme and practical completion.
No record of what was installed and when
When a joint has to be revisited, time-stamped, documented records show exactly what was installed and when — a complete quality-assurance history rather than guesswork.
Multi-trade coordination on facade defect lists
Balustrade and facade snags rarely arrive as one trade. Sealant, glass, stainless and coatings on the same defect list can be closed by one crew under one subcontract instead of three separate subcontractors to coordinate.
Rework and access cost after scaffold-down
A joint applied over a poor substrate or at the wrong width will re-fail once access is gone. Proving the joint before mass application avoids a return visit at height during the defects liability period.
How we do it
A documented method, every time
Survey and joint assessment
Walk the elevation or area, identify joint types (weather seal, movement joint, expansion joint, wet-area), record the substrates on each face, and log failed, missing or non-conforming runs against location — the basis of the ITP and the handover record.
Sample, sealant selection and colour match
Confirm the correct sealant chemistry for each substrate pairing (including where a primer or neutral-cure product is required), size the joint correctly, and — for visible joints — achieve an on-site colour match to the adjacent finish before any bulk application.
Method statement and ITP
Set out the approved methodology, hold points and inspection criteria in an inspection and test plan, agreed with the superintendent so the sign-off standard is clear before work starts.
Preparation and execution
Clean and dry the adhesion surfaces, install backer rod or bond breaker so the sealant flexes correctly, prime where specified, then apply and tool the joint within the material's working conditions — run on day or night shift, with surge labour where the programme demands it.
QA and documentation
Record each completed run with time-stamped images and live project documentation against the ITP, and make the record available to the builder through OneDrive for review at any time.
Inspection and sign-off
Present the documented joints for superintendent inspection and close them out, leaving a complete quality-assurance record that stands behind the work through the defects liability period.
Why it holds up
Evidence, not assurances
Install, inspect and repair — one accountable trade
The same team that runs the joint stands behind it through the defects liability period, rather than a supply-only installer who has left site.
Substrate-correct, not one-tube-fits-all
Sealant chemistry, priming and joint design are selected for each substrate pairing — glass, coated and anodised aluminium, stainless, stone, concrete and timber are each detailed differently.
Proved before mass application
The joint is confirmed — and, where visible, colour-matched to the adjacent finish on site — before the bulk of the work goes in, so the elevation is right the first time.
Documented for sign-off
ITP documentation, live records and time-stamped images via OneDrive give the superintendent quality-assurance evidence to close the joint and the builder a complete record of every run installed.
Day and night shifts with surge labour
Large re-seals and live-facade repairs can be sequenced around other trades and around operating hours, drawing on additional labour when the programme needs it.
Part of a single finishing subcontract
Caulking sits alongside facade rectification, glass, stainless and painting under one subcontract across Australia — a mixed defect list, one point of accountability.
Proof
Case studies featuring this service

One Sydney Harbour
Barangaroo, Sydney NSW

One Circular Quay
Circular Quay, Sydney NSW

Western Sydney Airport (WSI)
Badgerys Creek, Western Sydney NSW